Variations and Change Orders on Construction Projects
JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, sa.2, ss.89-96, 2010 (ESCI)
- Yayın Türü: Makale / Editöre Mektup
- Basım Tarihi: 2010
- Doi Numarası: 10.1061/(asce)la.1943-4170.0000016
- Dergi Adı: JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION
- Derginin Tarandığı İndeksler: Emerging Sources Citation Index (ESCI)
- Sayfa Sayıları: ss.89-96
- İstanbul Üniversitesi Adresli: Hayır
Özet
Redundancy is related to the amount of functionality that the structure can sustain in the worst-case scenario of structural degradation. This paper proposes a widely-applicable concept of redundancy optimization of finite-dimensional structures. The concept is consistent with the robust structural optimization, as well as the quantitative measure of structural redundancy based on the information-gap theory. A derivative-free algorithm is proposed based on the sequential quadratic programming (SQP) method, where we use the finite-difference method with adaptively varying the difference increment. Preliminary numerical experiments show that an optimal solution of the redundancy optimization problem possibly has multiple worst-case scenarios.