TAC Proton Accelerator Facility: The Status and Road Map


Algin E., Akkus B., Caliskan A., Sahin L., Yilmaz M.

2nd International Ulaanbaatar Conference on Nuclear Physics and Applications, Ulaanbaatar, Mongolia, 26 - 30 July 2010, vol.1342, pp.5-8 identifier identifier

  • Publication Type: Conference Paper / Full Text
  • Volume: 1342
  • Doi Number: 10.1063/1.3583159
  • City: Ulaanbaatar
  • Country: Mongolia
  • Page Numbers: pp.5-8
  • Istanbul University Affiliated: Yes

Abstract

Proton Accelerator (PA) Project is at a stage of development, working towards a Technical Design Report under the roof of a larger-scale Turkish Accelerator Center (TAC) Project. The project is supported by the Turkish State Planning Organization. The PA facility will be constructed in a series of stages including a 3 MeV test stand, a 55 MeV linac which can be extended to 100+ MeV, and then a full 1-3 GeV proton synchrotron or superconducting linac. In this article, science applications, overview, and current status of the PA Project will be given.