TAC Proton Accelerator Facility: The Status and Road Map


Algin E., Akkus B., Caliskan A., Sahin L., Yilmaz M.

2nd International Ulaanbaatar Conference on Nuclear Physics and Applications, Ulaanbaatar, Moğolistan, 26 - 30 Temmuz 2010, cilt.1342, ss.5-8 identifier identifier

  • Yayın Türü: Bildiri / Tam Metin Bildiri
  • Cilt numarası: 1342
  • Doi Numarası: 10.1063/1.3583159
  • Basıldığı Şehir: Ulaanbaatar
  • Basıldığı Ülke: Moğolistan
  • Sayfa Sayıları: ss.5-8
  • İstanbul Üniversitesi Adresli: Evet

Özet

Proton Accelerator (PA) Project is at a stage of development, working towards a Technical Design Report under the roof of a larger-scale Turkish Accelerator Center (TAC) Project. The project is supported by the Turkish State Planning Organization. The PA facility will be constructed in a series of stages including a 3 MeV test stand, a 55 MeV linac which can be extended to 100+ MeV, and then a full 1-3 GeV proton synchrotron or superconducting linac. In this article, science applications, overview, and current status of the PA Project will be given.